linked in
thursday, 21st september 2017

Vessel & Terminal Solutions

Vessels &
Terminal
Solutions
Terminal
concepts & cost assessment
Vessel concepts
(new-build)
Vessel concepts
(retrofit) & other
vehicles &
machinery
Financing models
for terminal
infrastructure &
vessel investment
SuAc 3.1: Terminal concepts & cost assessment

The objective of this sub- activity is to elaborate innovative technical solutions for terminals, their operation strategies and to perform the investment calculations for these terminals. Cost analysis shall cover all necessary LNG facilities and equipment, including storage tanks, berths, pipelines, tanker trucks whereas considering various types of bunkering solutions used in terminals (ship-to-ship, truck-to-ship, and terminal-to-ship). Determination and quantification of locations, necessary facilities, sizes and numbers of LNG filling tanks, bunker vessels and tank trucks shall be summarised as an outcome of this sub-activity for individual terminals planned by the respective beneficiary. Case studies for bunker stations will be performed on an individual basis, but the ports along the Rhine/Meuse (Antwerp, Strasbourg, Basle, and Mannheim) will pro-actively exchange experience and terminal concepts resulting from their individual case studies.

Related deliverables
Download: D 3.1.1-4 Terminal requirements and good practice
Download: D 3.1.3.1-2 Case Study LNG bunker stations - Ports of Mannheim and Switzerland
This email address is being protected from spambots. You need JavaScript enabled to view it. D 3.1.2.1 Technical concept Bunker station - Port of Antwerp
This email address is being protected from spambots. You need JavaScript enabled to view it.  D 3.1.2.2 Feasibility and technical concept LNG terminal in Ruse
This email address is being protected from spambots. You need JavaScript enabled to view it.  D 3.1.3.3 Feasibility study and preliminary terminal design for the LNG
terminal in the Port of Constanta (TTS, Romania)
This email address is being protected from spambots. You need JavaScript enabled to view it.  D 3.1.3.4 Pre-feasibility study regarding development of LNG terminals
on the Romanian Maritime Danube (Galati Port Authority, Romania)

On request:
Case study for LNG floating terminal in Komarno & Bratislava
(Danube LNG, Slovakia)
- Concept design
- Annex 1: Safety study
- Annex 2: EIA for LNG floating terminal in the port of Bratislava
- Annex 3: Preliminary enviro study for the LNG floating terminal in the port of Komarno
- Annex 4: Financial model & cost assessment