linked in
sunday, 30th april 2017

Pilot Deployment

Pilot
Deployment
LNG
Terminals
LNG Tankers
(LNG as cargo)
LNG propelled
vessel
(LNG as fuel)
LNG vehicles
& machinery
SuAc 5.3: LNG propelled vessel (LNG as fuel)

This sub-activity will address the deployment of inland vessels being propelled with LNG. The technical design of the vessels will be carried out by the implementing beneficiary under sub-activity 3.2 as well as all work related to receive permits including risk assessment studies (HAZID). The construction of the vessels as well as a limited period for start-up operations will be carried out under this sub-activity. Sub-activity 3.4 will contribute with regard to financing and business models. During the pilot operation phase, operative data will be collected and analysed with respect to engine performance, emissions, operations, repairs, safety procedures, etc. and assessed in SuAc 4.3.

Download: D 5.3.1.1 Vessel construction and initial operation of Eiger-DCL Barge_
Download:
 D 5.3.3.1 Technical concept LNG-fuelled chemical tanker Sirocco - Chemgas Barging
Download: D 5.3.3.2 Vessel construction LNG-fuelled chemical tanker Sirocco - Chemgas Barging
Download: D 5.3.3.3 Vessel initial operation - Sirocco - Chemgas Barging
Download: D 5.3.5.1 LNG-fuelled tanker EcoLiner - Damen
Download: D 5.4.2 LNG-fuelled trucks - Bulmarket