linked in
thursday, 22nd march 2018

Deliverables

This overview provides a summary of main project deliverables.

Framework and Market Analysis

D 1.1.1         Status Quo and Trend Analysis - Danube Corridor and Italy                         Download

D 1.1.1

  Status Quo and Trend Analysis - Rhine Corridor   Download
D 1.2.1

  Supply Study - Rhine Corridor   Download
D 1.2.2   Supply Study - Danube Corridor   Download

Annex


 


Pre-feasibility study for a possible LNG terminal as part of the LNG supply
chain and assessment of logistics costs for supply chain components -
Case EVN LNG - Terminal Lower Austria
  This email address is being protected from spambots. You need JavaScript enabled to view it.



Annex


 
LNG Supply & Demand Analysis: Regional results from Romania -
Constanta area
  Download


Annex   Fesibility study of transportation LNG from the Caspian and Black
Sea to Slovakia (Danube LNG EEIG)

  This email address is being protected from spambots. You need JavaScript enabled to view it.
D 1.3.1.1   Demand analysis - Danube Corridor   Download

D 1.3.1.2   Demand study - Rhine Corridor   Download

Annex

 

LNG Supply and Demand Analysis: Regional results from Romania -
Constanta area
  Download


D 1.4.1

 

Impact analysis of LNG as fuel and cargo for inland navigation on safety,
ecology and socio-economic aspects
  Download



Technologies and Operational Concepts

D 2.1.1
-2-3

  Engines technologies and related topics


Download

D 2.1.4      Recommendations and implementation guidelines - LNG in road transport This email address is being protected from spambots. You need JavaScript enabled to view it.

D 2.2.1

  Good practice report on fuel tank systems and equipment for IWT

Download
D 2.2.2.1
-2

  Design concept for on-board and on-shore LNG storage tanks Download
D 2.3.1      

                 
 

  
LNG Bunkering
Part A: LNG Bunkering: Regulatory Framework
Part B: LNG Bunker Procedures
Download



D 2.3.2









LNG Loading and Unloading
Part A: LNG loading and unloading: Regulatory framework
Part B: Standardised installations for loading and unloading
Part C: Standardised scenarios and procedures
Part D: Case study Port of Switzerland (EN)
Download





D 2.4.1
D 2.4.2






Safety and Risk Assessment
Part A: Operational safety and nautical conditions
Part B: Risk comparison of different LNG bunker scenarios
Part C: Comparison of risk assessment tools
Download




D 2.4.3





 



Case study of Port of Rotterdam
Part A: Gap study on regulations
Part B: LNG bunkering map: local conditions and spatial planning
Part C: Incompatibility of intermodal LNG activities
Part D: Impact on terminals
Part E: Impact on passing vessel
Download





D 2.4.4









Emergency and incident response study
EN
FR
DE
NL
 
Download
Download
Download
Download


Vessel and Terminal Solution
D 3.1.1-4

  Terminal requirements and good practices

  Download
D 3.1.2.1

  Technical concept Bunker station - Port of Antwerp

  On request
D 3.1.2.2

  Feasibility and technical concept LNG terminal in Ruse

  On request
D 3.1.3.1-2

  Case study LNG bunker stations - Ports of Mannheim and  Switzerland

  Download
D 3.1.3.3   Feasibility study and preliminary terminal design for the LNG terminal
in the Port of Constanta (TTS, Romania)

  This email address is being protected from spambots. You need JavaScript enabled to view it.
D 3.1.3.4   Pre-feasibility study regarding development of LNG terminals on the
Romanian Maritime Danube (Galati Port Authority, Romania)

  This email address is being protected from spambots. You need JavaScript enabled to view it.
D 3.1.3.5

  Case study for LNG floating terminal in Komarno & Bratislava
(Danube LNG, Slovakia)
    - Concept design
    - Annex 1: Safety study
    - Annex 2: EIA for LNG floating terminal in the port of Bratislava
    - Annex 3: Preliminary enviro study for the LNG flaoting terminal
      in the port of Komarno
    - Annex 4: Financial model & cost assessment

  On request
D 3.2.1-
3.3.1

  Database and analysis on technical vessel concepts and solutions


  Download

D 3.2.2.1   Technical concept - Combined LNG-MGO tanker of Argos Bunkering B.V.   Download

D 3.2.2.2

  Technical concept LNG inland tankers - LNG E-Motion

  Download

D 3.2.2.3


  Vessel concept Chemgas Holding - Final report on different cryo cargo
tank insulation

  Download

D 3.2.2.4   Technical concept LNG pusher - Kooiman Marine

  Download
D 3.2.2.5   Technical concept LNG fuelled chemical tanker Ecoliner - DAMEN

  Download
D 3.2.2.6   Technical concepts including permits for LNG coastal
carrier/bunker vessels (Bernhard Schulte, Cyprus)
  This email address is being protected from spambots. You need JavaScript enabled to view it.
D 3.2.3.1
-2-3
  Technical concept for Danube Sea-River LNG tanker, LNG Barge
and LNG Pier

  Download

D 3.3.2.1   Technical concept - retrofit of container vessel Eiger - DCL Barge

  Download
D 3.3.2.2   Feasibility study for retrofit - new built - NAVROM

  Download
D 3.3.3.1   Technical concept Economic evaluation for LNG retrofit of river
pushers - Danube LNG

  Download
D 3.3.4.1   LNG terminal and LNG fuelling station in Ruse - feasibility and
technical concept

  Download
D 3.3.4.2
-5.4.2

  Specifications and pilot deployment of three LNG tank trucks


  Download

D 3.3.5

  Alternative fuels for port equipment - Antwerp

  Download

D 3.4.2       Analysis of regulatory, legal and contractual impacts on LNG supply chains

  Download
Annex I   Legal assistance. LNG Terminal Galati-Romania

  Download
D 3.4.3

  Guidelines and recommendations for LNG terminal projects

  Download
D 3.4.4   Financial models for LNG related infrastructure investments

  Download
D 3.4.5

  Guidelines and recommendations for LNG vessels investments

  Download
D 3.4.6

  TCO Model for transition towards LNG powered inland vessels
TCO model - tool

  Download
  This email address is being protected from spambots. You need JavaScript enabled to view it.
D 3.4.10   Legal and regulatory road map   Download


Regulatory Framework and Masterplan

D 4.1.1

        Report on regulatory work (CCNR and ADN). Integral Coordination
Group for Regulatory Adjustments LNG
Download


D 4.1.2  
-4
   


Guidelines for Port regulations and best practice LNG bunkering

Download
D 4.1.3   Guidelines & recommendations on port regulations are summarised
in “D 2.4.1-2 Safety and Risk Assessment.
Part A: Operational safety and nautical conditions”

Download
D 4.1.4   Guidelines & recommendations on police regulations are summarised
in “D 4.1.2-4 Guidelines for Port regulations and best
practice LNG bunkering”

Download
D 4.1.5  

          Guidelines & recommendations for emergency response organisations
are summarised in “D 2.4.4 Emergency and incident
response study”

Download
D 4.2.2   Report on Status Quo in the LNG training and education, identification
of gaps and specification of requirements

Download
D 4.2.3
-4 -5 -9
  Curricula for (3) bunkering personnel, (4) terminal personnel,
(5) crew members – LNG as fuel, (9) Logistics

Download
D 4.2.3   Lessons material for bunkering personnel and staff (EN)
Netherlands (in Dutch)
Romania (in Romanian)

This email address is being protected from spambots. You need JavaScript enabled to view it.
This email address is being protected from spambots. You need JavaScript enabled to view it.
This email address is being protected from spambots. You need JavaScript enabled to view it.
D 4.2.4   Lessons material for terminal personnel and staff (OL and ML
and where appropriate for support level) (EN)
Netherlands (in Dutch)
Romania (in Romanian)


This email address is being protected from spambots. You need JavaScript enabled to view it.
This email address is being protected from spambots. You need JavaScript enabled to view it.
This email address is being protected from spambots. You need JavaScript enabled to view it.
D 4.2.5   Lessons and training material for inland navigation crew members
for use of LNG as a fuel
Netherlands (in Dutch)
Romania - Ceronav (in Romanian)
Romania - University of Craiova (in Romanian)



This email address is being protected from spambots. You need JavaScript enabled to view it.
On request
This email address is being protected from spambots. You need JavaScript enabled to view it.
D 4.2.6   Curricula for inland navigation crew members (OL and ML) for use
of LNG as a cargo

Lessons and training material for inland navigation crew members
(OL and ML) for use of LNG as a cargo. (EN)
Netherlands (in Dutch)
Romania (in Romanian)

Download



This email address is being protected from spambots. You need JavaScript enabled to view it.
This email address is being protected from spambots. You need JavaScript enabled to view it.
This email address is being protected from spambots. You need JavaScript enabled to view it.
D 4.2.7

  Delivery of pilot simulations or simulators, e-learning and pratical training tools

Download
D 4.2.8   Curricula for inspectors from competent authorities and company
personnel (OL and ML)

Lessons material for inspectors from competent authorities and
company personnel (OL and ML) (EN)
Netherlands (in Dutch)

Download



This email address is being protected from spambots. You need JavaScript enabled to view it.
This email address is being protected from spambots. You need JavaScript enabled to view it.
D 4.2.9




  Curriculum for students focusing on logistics

Lessons and training material for students focusing on logistics
Austria (in German)
Download 


This email address is being protected from spambots. You need JavaScript enabled to view it.
D 4.2.10   Pilot classes for all categories, including evaluation report

Download
D 4.2.11   Education & Training Requirements - Final Report

Download
D 4.3.2
-3-5

  Assessment concepts pilots: Emission measurements Download
D 4.4.3

   LNG Implementation Strategy & Recommendations

Download
D 4.4.3   Annex: Masterplan for LNG implementation on the Italian IWT Download


Pilot Deployment

D 5.1.2
-5.4.1
  LNG terminal and fuelling station in Ruse BG - construction phase


Download

D 5.3.1.1
-2

  Vessel construction and intial operation of Eiger - DCL Barge

Download
D 5.3.3.1   Technical concept LNG-fuelled chemical tanker Sirocco - Chemgas Barging

Download
D 5.3.3.2   Vessel construction LNG-fuelled chemical tanker Sirocco - Chemgas Barging

Download
D 5.3.3.3   Vessel initial operation - Sirocco - Chemgas Barging

Download
D 5.3.5.1         LNG-fuelled tanker EcoLiner - Damen                                                                                         Download
D 5.4.2   LNG-fuelled trucks - Bulmarket Download